Beaminster, Mosterton, Broadwindsor, Buckham Diversion Routes

All these routes are now being looked after by a highways team permanently until the Beaminster Tunnel is opened, and are being gritted too.  I am very grateful for everyone’s support; this is an exceptional time for the area and many of those lanes are taking very much more traffic than usual. Thank you and keep me posted if things need doing.  I am now of course getting a resurface for the lanes once the Tunnel is opened in May 2013.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

One Response to Beaminster, Mosterton, Broadwindsor, Buckham Diversion Routes

  1. Rohaise Newall says:

    Hello Rebecca, I’m Chairman of Mapperton Parish Meeting and would like to say how impressed I am with the snow clearance and gritting on the roads and lanes in this part of Dorset……….. even though I do like being snowed in! Many thanks to you and everyone involved. Rohaise Newall

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s