Beaminster tunnel

20130513-155208.jpg

There are 3 separate drilling rigs all working together in this picture, 2
on excavators and one on an abseiling frame, and lots of installed nails
visible.

Advertisements
Image | This entry was posted in Uncategorized. Bookmark the permalink.

3 Responses to Beaminster tunnel

  1. Julie Wood says:

    Does the time scale for re opening the tunnel still stand at late June/ early July and if so which is more likely?

    Thank you
    Julie

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s